Job Package Audit Date:________________
1. WO # and job description:_____________________
2. Score the information you were given: 0 = None to 5 = Just what I needed SCORE—did you get any information “Y or N” and how good was it “1 – 5”
Was there a printout of the work order long text or other scope description? | (Y/N) | _________ |
Did you understand what to do to solve the problem? | (Y/N) | _________ |
Did you understand when this job is to be completed? | (Y/N) | _________ |
Did you know the exact location and when the job is to start? | (Y/N) | _________ |
Were materials provided or staged when the job was assigned? | (Y/N) | _________ |
Was safety and permit information provided for the specific job? | (Y/N) | _________ |
Was the name of the LOTO/area contact provided? | (Y/N) | _________ |
Were needed support resources available at the start? | (Y/N) | _________ |
Were pictures, sketches, or drawings provided? | (Y/N/NA) | _________ |
If personal lifting was required, was the weight specified? | (Y/N/NA) | |
Was the test equipment calibrated and provided? | (Y/N/NA) | _________ |
Was the equipment down and ready at the scheduled start? | (Y/N) | _________ |
3. What other questions do you have that could have been answered prior to starting this job that could have made your work more efficient or eliminated delays or problems?
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
4. Now that you have finished this job, what feedback can you provide to the planner that will make it easier to do next time?
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
Audit Performed by:______________________________________________________________________________
This second form can provide a good source of information from the mechanics to help the planners make each repeat job better the next time it is performed.
WO #____________________ Date:_________________________________________________________
WO description:_______________________________________________________________________________
____________________________________________________________________________________________
1. Was this job an emergency, was it a break-in, or was it scheduled? | (E/B/S) |
2. Was a job package provided when the work was assigned? | (Y/N) |
3. Were the equipment and permits ready for the start of work? | (Y/N) |
4. Identify causes of delays and actual time lost:_____________________________________________________
________________________________________________________________________________________
5. Did the information shared from the planner, team manager, or scheduler help you do the job more efficiently? | (Y/N) |
6. What else did you need to know?_______________________________________________________________
_________________________________________________________________________________________
7. What parts were needed that were not provided?___________________________________________________
_________________________________________________________________________________________
8. Did stores have the materials you needed to do the job? | (Y/N) |