Repairable Systems Reliability Analysis. Rajiv Nandan Rai

Чтение книги онлайн.

Читать онлайн книгу Repairable Systems Reliability Analysis - Rajiv Nandan Rai страница 3

Repairable Systems Reliability Analysis - Rajiv Nandan Rai

Скачать книгу

of APWPC WRT AB.Table C16 Composite impact of APWPC on APWC.Table C17 Comparison of APWPCH WRT FL.Table C18 Comparison of APWPCH WRT SA.Table C19 Comparison of APWPCH WRT UB.Table C20 Comparison of APWPCH WRT RN.Table C21 Comparison of APWPCH WRT SH.Table C22 Comparison of APWPCH WRT CS.Table C23 Comparison of APWPCH WRT REL.

      List of Illustrations

      1 Chapter 1Figure 1.1 Types of repair.Figure 1.2 Various techniques for reliability analysis.

      2 Chapter 2Figure 2.1 A MCF example.Figure 2.2 An improving system.Figure 2.3 A stable system.Figure 2.4 A deteriorating system.Figure 2.5 History and distribution of failures observed at age t.Figure 2.6 MCF plot of Example 2.2.Figure 2.7 Graphical plots of Example 2.3.Figure 2.8 MCF with confidence bounds of Example 2.2 data.Figure 2.9 MCF plot of Example 2.4.Figure 2.10 A ROV. (Image taken from: https://www.pinterest.com/pin/55267618...Figure 2.11 MCF by combining all failure modes.Figure 2.12 Event plot for each system.Figure 2.13 MCF plot of each system.Figure 2.14 Grouping of systems based on performance behavior.Figure 2.15 Event plot of all three groups.Figure 2.16 MCF plot of all three groups.

      3 Chapter 3Figure 3.1 Bathtub-shaped intensity function.Figure 3.2 Conditional probability of occurrence of failures.Figure 3.3 Photograph of an aero engine.Figure 3.4 Intensity function plot for Example 3.1.Figure 3.5 Intensity function plot for Example 3.2.Figure 3.6 Intensity function plot for Example 3.3.Figure 3.7 Availability plot for Example 3.3.

      4 Chapter 5Figure 5.1 Reliability-based HFRC threshold.Figure 5.2 Availability-based threshold for HFRC.Figure 5.3 Flying task vs. availability.

      5 Chapter 6Figure 6.1 q vs. F(vi | vi–1) for FM1.Figure 6.2 q vs. F(vi | v i–1) for FM2.Figure 6.3 q vs. F(vi | v i–1) for FM3.

      6 Chapter 7Figure 7.1 Overview of the approach.Figure 7.2 Evaluation of alternatives through ANP.Figure 7.3 Evaluation of APE through AHP.

      7 Chapter 8Figure 8.1 Overview of Chapter 8.Figure 8.2 Propagation of variability between workstations in series.Figure 8.3 Work flow/work stations for engine overhaul line.Figure 8.4 Work flow/work stations for LPCR blades.Figure 8.5 Work flow/work stations for CCOC.Figure 8.6 Work flow/work stations for LPTR blades repair.

      Guide

      1  Cover

      2 Table of Contents

      3  Begin Reading

      Pages

      1  ii

      2  iii

      3  iv

      4  ix

      5  x

      6  xi

      7  xii

      8  xiii

      9  xv

      10  xvi

      11  xvii

      12  xix

      13  xx

      14  1

      15  2

      16  3

      17  4

      18  5

      19  6

      20  7

      21  8

      22  9

      23 10

      24  11

      25  12

      26  13

      27  14

      28 15

      29  16

      30  17

      31  18

      32  19

      33  20

      34  21

      35  22

      36  23

      37  24

      38  25

      39  26

Скачать книгу