      1.4.1 Norway

      In Norway, developments of risk assessment have been made in parallel with the offshore oil and gas activities. The first major oil and gas accident, the Bravo blowout on the Ekofisk field in the North Sea, occurred in 1977. There were no fatalities but a significant release of oil to the sea. First and foremost, this accident was an eye‐opener for the authorities and the oil companies who suddenly realized that the oil and gas activities were associated with a very high risk. As a consequence of this accident, the Norwegian Research Council initiated a large research program called Safety Offshore, and the authorities demanded the oil companies to support Norwegian research projects and universities. This requirement was strengthened after the second major accident, the capsizing of the semi‐submersible accommodation platform Alexander L. Kielland in 1980, with 123 fatalities.

      The use of risk assessment has increased vastly over the years. A steadily increasing number of legislations, regulations, and standards require or mention risk assessment – and methods are being developed. The increase that we have seen therefore seems to continue into the future.

      The prime objective of any risk assessment is to provide decision support. Whenever making a decision that affects risk, a risk assessment helps understanding what the sources of risk are. To illustrate this issue, some typical process industry decisions that can be supported by information from risk assessment are listed.

      1 Location of a process plant. Chemical process plants often handle toxic, flammable, and/or explosive materials (commonly called hazardous materials). Release of these materials may affect people living or working outside the plant. Understanding the risk these people are exposed to is important before making a decision about where to locate a plant.

      2 Layout of a process plant. Release of flammable material may cause fire, and this may spread to other equipment, leading to a far more severe event than the initial fire. Understanding the sources of risk may help us locate the equipment at safe distances from each other.

      3 Need for and design of safety systems. All process plants are protected by a range of safety systems, to reduce pressure in tanks and vessels in emergencies, to isolate equipment that is leaking, to detect fires and gas releases, to extinguish fires, and so on. Risk assessment can help us understand what capabilities and capacities these systems need to have to protect against accidents.

      4 Performing maintenance operations. There is a need for continuous maintenance of equipment in a process plant. Some of the work may represent a risk to the maintenance personnel and to others. Risk assessment can help us plan the work so it can be performed in a safe manner and inform the personnel about the risk involved.

      5 Deciding about repairs and modifications. Equipment that is important for safety may fail during the operation of a plant and we normally want to repair this as quickly as possible. Sometimes, doing the repair may represent a risk, and we need to weigh the risk associated with doing the repair against the risk associated with postponing the repair, for example, until the next major shutdown of the plant. Risk assessment can be used to compare options.

      6 Reliable work operations. Sometimes, work operations may be particularly critical to perform correctly because errors in the performance may have large consequences. Risk assessment can be used to systematically evaluate such work operations, to identify if changes are required.

      7 Reductions in manning. A common situation is that cost cutting leads to reduction in manning in process plants. This can have unwanted effects such as less time to perform work or postponement of work that may be critical to maintain a safe plant. Risk assessment can also be used in situations like these, to determine what the effects are on risk.

      These are just some examples of decisions where risk assessment may provide input to the decision‐making process. The examples illustrate the wide range of problems that may be addressed, from wider issues such as location of a plant to technical details of how an individual system should be designed, and from purely technical issues to issues involving human and organizational factors.

Risk arena Application or problem area
Hazardous substances Chemical/process industry, petroleum industry (incl. pipelines), explosives industry, nuclear industry.
Transport Air traffic (airplanes, helicopters, drones), railways, marine transport, road transport.
Space industry Space equipment and projects.
Product safety Technical products, such as machinery, cars, robots, autonomous systems.
Critical infrastructures Drinking water supply, sewage systems, power grids, communication systems, hospitals and health‐care, banking and financial systems.
Medical sector Medical equipment, robotic surgery, bacteria/viruses.
Work, activity Industry, agriculture, forestry, sport.
Environmental protection Pesticides, images , temperature increases, ocean level increases.
Food safety Contamination, infection.
Health safety Cancer, tobacco, alcohol, radiation.
Project risk Time and cost of large projects (e.g. construction, software development).
Economic/financial Insurance, investment, financial, enterprise, and project risk.
Security Sabotage, theft, cyberattacks, espionage, terrorism.