{ From Harrisburg to Robinson's 132.67 $1,990,952 { " Robinson's to Hollidaysburg 6.33 32,000 Graduation { " Hollidaysburg to Johnstown 36.67 { " Johnstown to Pittsburg 76.00 1,515,000 Total 251.67 3,537,952 Superintendence and Contingencies 419,754 Superstructure. Including turn-outs on 215 miles 2,408,000 Cost of Road $6,365,706 Interest account 450,000 Land damages and fencing 154,294 Grand Total $6,970,000

      To the above amount should be added, for the purchase of depot grounds, erection of warehouses and shops, and the construction of cars and locomotives, as follows:

Warehouses, including ground at depots $475,000.00
Shops and machinery 185,000.00
Locomotives 510,000.00
Passenger and burden cars 820,000.00
——————
Total $1,990,000.00

      Making the whole cost of the Road, graded for a double and a single track laid, including outfit, $8,960,000.00.

      It will not be necessary to expend the whole of this amount until some time after the Road is in use to Pittsburg. As the business increases the turnouts must be lengthened, depots and shops enlarged, and the number of locomotives and cars added to. These will not reach the sum estimated until probably four years after the Road is completed, in connection with the Allegheny Portage. We shall also reduce the cuttings and embankments to a single track width, wherever the character of the excavations or a deficiency of material for embankment will justify the curtailment. This will effect a saving, in the first outlay, of about $450,000, which will not be required until the business demands a double track.

      The expenditure for the outfit, when the Road is opened through, will not exceed $1,340,000, leaving $650,000 of the estimate for this item to be disbursed after the Road is finished, to meet the demands of the increased business for the time stated.

      This will leave the cost of the Road and outfit, when opened for use, in connection with the Portage Road to Pittsburg, as follows:

Cost of Road, with single track and turn-outs, as estimated $6,365,706.00
Less estimated cost of unfinished grading required to prepare the Road for double track 450,000.00
——————
Leaving cost of grading and superstructure of Road $5,915,706.00
To this add interest account $450,000
And land damages and fencing 154,294
————
604,294.00
Also, cost of locomotives, shops, depots and cars 1,340,000.00
——————
Total $7,860,000.00

      The Board having wisely determined in no event to enter into engagements beyond their ascertained means, I have thought it best, thus early, to present an estimate of the cost of the whole work for their guidance. It will be recollected that the estimate for the grading is made, in part, upon experimental surveys, with full allowances for contingencies. By the close of the year we hope to be able to give an estimate of the whole Road, in detail, from actual location, which may show a somewhat reduced cost.

      Under the contemplated connection with that road, the Allegheny Portage becomes an important part of our line, and, for the information of the Board, I insert the following description of it, extracted from a pamphlet written by S. W. Roberts, Civil Engineer:

      "The Portage Railroad consists of eleven levels, or graded lines, and ten inclined planes. The ascent from Johnstown to the summit is 1,171.58 feet, in a distance of 26.59 miles, and the descent, from the summit to Hollidaysburg, is 1,398.71 feet in a distance of 10–1/10 miles. There are five inclined planes on each side of the mountain, varying, in inclination, from 4° 9´ to 5° 51´, or from 7.25 feet to 10.25 feet elevation to each 100 feet base. They are numbered eastwardly, the one nearest Johnstown being No. 1; that nearest Hollidaysburg, No. 10. The following table shows the length, rise and fall of each 'Level' or grade line, and each inclined plane."

Скачать книгу

Feet
Level No. 1 From Johnstown to Plane No. 1 4.13 miles Rise, 101.46
Plane 1 Ascending 1607.74