CB close (connects sub-system to main system) 10 3.00 End

Schematic illustration of IEEE 9 bus test system MATLAB simulation model.

      During the single-phase to ground fault (i.e. between 2.0 and 2.5 s), the load voltage rises to 1.25 pu due to the intentional islanding of the generator at the bus no. 3 and load at the bus no. 5. The voltage profile improves due to the islanding of a balanced system.

       2.5.3.2 Test Case: 2—Without GUPFC and With Fuel Cell

Schematic illustration of load voltage profile in test case-2.

       2.5.3.3 Test Case: 3—With GUPFC and Without Fuel Cell

Schematic illustration of load voltage profile in test case-3.

      The load voltage again rises to 1.1 pu and remains constant during the single-phase to ground fault (i.e. during 2.0 to 2.5 s) with a brief switching spike at the instant of 2.0 s. After clearing of the fault, the load voltage becomes normalized to 1 pu.

       2.5.3.5 Test Case: 5—With Active GUPFC

Schematic illustration of load voltage profile in test case-4.

      By examining different test cases, it can be seen that load voltage remains constant with active GUPFC. The percentage load voltage deviation from the rated