Intelligent Renewable Energy Systems. Группа авторов
Чтение книги онлайн.
Читать онлайн книгу Intelligent Renewable Energy Systems - Группа авторов страница 19
Figure 1.2 Variation of load demand (pu) and solar power generation (pu) with load hour.
Table 1.5 Cost and lifetime of different DGs.
Biomass DG | Solar PV | Shunt capacitors | |
---|---|---|---|
Cost ($) | 3000/kW [60] | 770/kW [60] | 9/kVAr |
Lifetime (years) | 40 | 20 | 5 |
1.5.1 Optimum Placement of RDGs and Shunt Capacitors to 33-Bus Distribution Network
In this section, the optimum placement of biomass DG, solar PV, and shunt capacitors, to the 33-bus distribution network is discussed. Table 1.6 presents the optimum sizes and locations of biomass DG, solar PV, and shunt capacitors for different load hours of the 33-bus distribution networks. The reductions of active power loss and VDI for different load hours have been shown in Figures 1.3 and 1.4, respectively. From Table 1.6 and Figure 1.3, it may be noticed that the active power loss reduction after the placement of biomass DG, solar PV, and shunt capacitor is quite significant for all the load hours. After the placement of RDGs and shunt capacitors to bus numbers 14, 31, and 30, respectively, the active power loss of the 33-bus distribution network reduces from 202.6771 kW to 36.8247 kW for the 15th load hour. It may also be noticed that in presence of solar radiation, the active power loss reduction is higher compared to the same when the solar power generation is less or absent.
From Table 1.6 and Figure 1.4, it may be noticed that the improvement of the voltage profile of the 33-bus distribution network is very good for all the load hours of the day. Improvement of the voltage profile of the distribution network leads to the reduction of VDI. From Table 1.6 and Figure 1.4, the reduction of the VDI for all the load hours of the day may be noticed quite prominently. The voltage profile before and after the placement of DG to the 33-bus distribution network, for the 15th load hour, has been presented in Figure 1.5.
Table 1.6 Optimum placement of RDGs and shunt capacitors to the 33-bus distribution network.
Load hour | Optimum size of biomass DG (kW) | Optimum size of solar PV (kW) | Optimum size of shunt capacitor (kVAr) | Active power loss before placement of DG (kW) | Active power loss after placement of DG (kW) | Base VDI (before placement of DG) | VDI after placement of DG |
---|---|---|---|---|---|---|---|
Location – 14 | Location - 31 | Location - 30 | |||||
1 | 621.5083 | 1759.48 | 800 | 78.6548 | 29.4379 | 0.0453 | 0.0037 |
2 | 586.0025 | 1759.48 | 750 | 68.7376 | 25.8221 | 0.0396 | 0.0032 |
3 | 568.0646 | 1759.48 | 725 | 64.0501 | 24.1064 | 0.0369 | 0.003 |
4 | 550.005 | 1759.48 | 700 | 59.5413 | 22.4517 | 0.0343 | 0.0028 |
5 | 550.005 | 1759.48 | 700 | 59.5413 | 22.4517 | 0.0343 | 0.0028 |
6 | 568.0646 | 1759.48 | 725 | 64.0501 | 24.1064 | 0.0369 | 0.003 |
7 | 617.4665 | 1759.48 | 800 | 78.6548 | 28.7562 | 0.0453 | 0.0036 |
8 | 671.2714 | 1759.48 | 925 | 112.8660 | 31.2546 | 0.0651 | 0.0039 |
9 | 683.3 | 1759.48 | 1025 | 150.3564 | 30.2443 | 0.0868 | 0.0035 |
10 | 685.9 |
1759.48
|